← All standards & equipment
API

API 520 Part II

Sizing, Selection, and Installation of Pressure-relieving Devices — Installation

Issuing body
API
Latest edition
7th Edition (2020)
Region
USA, Global
Equipment items
1

Scope

Installation guidance — inlet/outlet piping, reaction forces, discharge.

Key requirements (9)

  • Installation of pressure-relieving devices in refineries — companion to API 520-1 (sizing).
  • Inlet line pressure loss ≤ 3% of set pressure at rated flow (rule preventing chatter).
  • Outlet (built-up) backpressure ≤ 10% set pressure for conventional valves; ≤ 50% for balanced bellows.
  • Inlet line schedule: typically same as PRV nozzle, no reductions.
  • Block valves under PRVs: car-sealed open (CSO) or locked open (LO) per OSHA 1910.119.
  • PRV elevation: discharge piping should self-drain back to disposal header.
  • Reactive force calculation required for open atmospheric discharges (especially relief to atmosphere).
  • Tail pipe sizing: avoid two-phase flow regime transitions.
  • Multiple PRVs: staggered set pressures to prevent simultaneous popping.

Related standards (1)

Applied to 1 equipment item